DESIGN OF BRINE INJECTION PIPELINE AT ULUBELU GEOTHERMAL POWER PLANT SYSTEM CLUSTER E TO CLUSTER R1 AND R2
Geothermal potential as the largest alternative energy source in Indonesia reaches 23.9 Giga Watt (GW). However, the utilization of this energy is only 8.9% or 2,130.6 MW. This has prompted the government through the Ministry of Energy and Mineral Resources to target an increase in geothermal utiliz...
Saved in:
Main Author: | Maximilian S. Wongkar, Marvin |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/68807 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TECHNO-ECONOMIC STUDY OF HYDROGEN PRODUCTION SYSTEM WITH BRINE UTILIZATION TECHNOLOGY AT ULUBELU GEOTHERMAL POWER PLANT
by: Resha, Mochammad -
DESIGNING BRINE PIPELINE FOR GEOTHERMAL POWER PLANT USING HDPE PIPE
by: Rahadyan, Ari -
STUDY OF UTILIZATION OF ORGANIC RANKINE CYCLE MODULE FOR BINARY CYCLE APPLICATION IN ULUBELU GEOTHERMAL POWER PLANT
by: PUTU DODY WIDIANA - NIM: 23115307, I -
STUDY OF UTILIZATION OF ORGANIC RANKINE CYCLE MODULE FOR BINARY CYCLE APPLICATION IN ULUBELU GEOTHERMAL POWER PLANT
by: Putu Dody Widiana, I -
DESIGN OF GEOTHERMAL POWER PLANT (GPP) BINARY CYCLE PIPING SYSTEM 10 MW CASE STUDY: ULUBELU AREA
by: Zahwa Efendi, Maulida