Abstract: Makassar New Port is among ports included in National Strategic Projects as an international port that acts as a pillar of Indonesia’s economic growth. To ensure loading and unloadings of containers are done condusively, breakwater is needed to create calm waters at the harbor pool. In...

Full description

Saved in:
Bibliographic Details
Main Author: Giovani Lukman, Harlan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69106
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:69106
spelling id-itb.:691062022-09-20T11:51:12ZPERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW Giovani Lukman, Harlan Indonesia Final Project Floating breakwater, Heave Response, Roll Response, Transmission Coefficient, Catenary Mooring, Makassar New Port INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69106 Abstract: Makassar New Port is among ports included in National Strategic Projects as an international port that acts as a pillar of Indonesia’s economic growth. To ensure loading and unloadings of containers are done condusively, breakwater is needed to create calm waters at the harbor pool. In this final project, the design of a box-type floating breakwater structure made up of reinforced concrete with polystyrene core and concrete ballast will be carried out. Heave and roll response were calculated with design wave height of 2.425 meters and wave period of 6.921 second. The result of maximum heave response calculation is 0.534 meter and maximum roll response calculation is 6.81 degrees. Transmission wave coefficient was calculated with energy flux flowing inside the channel created between the base of the structure and seabed, assuming that the structure response doesn’t generate wave. The result of transmission wave coefficient calculation is 0.198 with transmission wave height of 0.481 meters. Catenary mooring system analysis was conducted with maximum tidal current of 0.422 meter per second. Mooring line was in the form of stud chain with a proof load of 166 kN. The result of catenary mooring system analysis on highest tide are mooring line length of 14.265 meters and anchor weight of 2197.969 kg. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Abstract: Makassar New Port is among ports included in National Strategic Projects as an international port that acts as a pillar of Indonesia’s economic growth. To ensure loading and unloadings of containers are done condusively, breakwater is needed to create calm waters at the harbor pool. In this final project, the design of a box-type floating breakwater structure made up of reinforced concrete with polystyrene core and concrete ballast will be carried out. Heave and roll response were calculated with design wave height of 2.425 meters and wave period of 6.921 second. The result of maximum heave response calculation is 0.534 meter and maximum roll response calculation is 6.81 degrees. Transmission wave coefficient was calculated with energy flux flowing inside the channel created between the base of the structure and seabed, assuming that the structure response doesn’t generate wave. The result of transmission wave coefficient calculation is 0.198 with transmission wave height of 0.481 meters. Catenary mooring system analysis was conducted with maximum tidal current of 0.422 meter per second. Mooring line was in the form of stud chain with a proof load of 166 kN. The result of catenary mooring system analysis on highest tide are mooring line length of 14.265 meters and anchor weight of 2197.969 kg.
format Final Project
author Giovani Lukman, Harlan
spellingShingle Giovani Lukman, Harlan
PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW
author_facet Giovani Lukman, Harlan
author_sort Giovani Lukman, Harlan
title PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW
title_short PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW
title_full PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW
title_fullStr PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW
title_full_unstemmed PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW
title_sort perancangan struktur pemecah gelombang terapung di makassar new
url https://digilib.itb.ac.id/gdl/view/69106
_version_ 1822005944014340096