PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW
Abstract: Makassar New Port is among ports included in National Strategic Projects as an international port that acts as a pillar of Indonesia’s economic growth. To ensure loading and unloadings of containers are done condusively, breakwater is needed to create calm waters at the harbor pool. In...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69106 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!