PERANCANGAN STRUKTUR PEMECAH GELOMBANG TERAPUNG DI MAKASSAR NEW

Abstract: Makassar New Port is among ports included in National Strategic Projects as an international port that acts as a pillar of Indonesia’s economic growth. To ensure loading and unloadings of containers are done condusively, breakwater is needed to create calm waters at the harbor pool. In...

Full description

Saved in:
Bibliographic Details
Main Author: Giovani Lukman, Harlan
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69106
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first