SOLID WASTE PROCESS IN PIYUNGAN FINAL DISPOSAL WITH THE RECYCLE AND COMPOSTING

The major problem of solid waste in Aglomerasi Perkotaan Yogyakarta (APY) is a managing of Piyungan final disposal, especially about the time limits landfill service. Piyungan Landfill have an area = 92660 m2, total volume = 1776224 m3, present volume = 723706 m3. For anticipating that problem, re...

Full description

Saved in:
Bibliographic Details
Main Author: Afrianti simon , Wira
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/6913
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia