WATER QUALITY SIMULATION MODEL OF COAL PIT LAKES IN PIT D2 BINUNGAN SITE PT BERAU COAL, EAST KALIMANTAN
Coal mining activities are generally carried out using the open pit mining method. Large scale excavation without backfilling activity can lead to the formation of a big hole (void) at the end of mining activity. Post-mining lakes (pit lakes) can form if the voids are filled with water. D2 Pit locat...
Saved in:
Main Author: | Widowati, Danis |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69298 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
by: Wulandari, Diah -
PERFORMANCE STUDY OF COAL HAULING AND LOADING FROM PIT TO CPP AT CH PIT OF BINUNGAN SITE PT BERAU COAL
by: Maolana, Bayu -
WATER QUALITY SIMULATION OF COAL PIT LAKES (CASE STUDY: C1E AREA, BINUNGAN MINE OPERATION 02, BERAU COAL)
by: G. A. Umbu Roga, Ztievhanny -
PROBABILITY OF SLOPE DESIGN FAILURE ANALYSIS PIT D2 ON OPEN PIT COAL MINE PT BERAU COAL EAST KALIMANTAN
by: Fathkhan Mubin, Reza -
MINE DRAINAGE FACILITY PLANNING AT OUT-PIT DUMP C1 SITE BINUNGAN MINE OPERATION 2 BLOK 8 PT BERAU COAL, EAST KALIMANTAN
by: Clara Chika Giri Asta P, Putu