MINE DRAINAGE FACILITY PLANNING AT OUT-PIT DUMP C1 SITE BINUNGAN MINE OPERATION 2 BLOK 8 PT BERAU COAL, EAST KALIMANTAN
In open-pit mining, the overburden material needs to be excavated or blasted to a certain depth. The material will be transported to the disposal area according to the planned progress plan. When there is heavy rain, the disposal material will be eroded due to its characteristic as a loose material....