STUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK.
In the last few years PT. Timah is starting to improve its productivity by opening several new inland mining locations. Several of which are inland mine for primary tin such as XYZ site. This location will be mined by conventional method using excavators and trucks. PT. Timah tries to analyze min...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/69559 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:69559 |
---|---|
spelling |
id-itb.:695592022-10-24T13:16:28ZSTUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK. Darusman, Rosita Indonesia Final Project Mine planning, primary tin, mine equipment INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69559 In the last few years PT. Timah is starting to improve its productivity by opening several new inland mining locations. Several of which are inland mine for primary tin such as XYZ site. This location will be mined by conventional method using excavators and trucks. PT. Timah tries to analyze mineplan design that can be applied to XYZ mine, in order to fulfill its production target. This research is done to support that study by using existing secondary data. Mine pit aperture design was done with Datamine Studio 3 software based on data results of XYZ site study that was done by P2P and exploration department of PT. Timah (Persero) Tbk. until the time of this study was conducted (July 2012). Final mining pit design result provides 6.950.500 BCM total which is include ore production as much as 4.254.200 m3 grading 0,718 kg Sn/m3. Total tin tonnage from jig output that is targeted by PT. Timah for XYZ mine is 2.500 ton, while author made model generate 3.053 ton, an excess of 553 ton is gotten. Equipment necessity to mine XYZ mine are two excavators average for overburden and three for ore for every year, each of which needs four untill five trucks. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
In the last few years PT. Timah is starting to improve its productivity by opening
several new inland mining locations. Several of which are inland mine for
primary tin such as XYZ site. This location will be mined by conventional method
using excavators and trucks. PT. Timah tries to analyze mineplan design that can
be applied to XYZ mine, in order to fulfill its production target. This research is
done to support that study by using existing secondary data. Mine pit aperture
design was done with Datamine Studio 3 software based on data results of XYZ
site study that was done by P2P and exploration department of PT. Timah
(Persero) Tbk. until the time of this study was conducted (July 2012). Final
mining pit design result provides 6.950.500 BCM total which is include ore
production as much as 4.254.200 m3 grading 0,718 kg Sn/m3. Total tin tonnage
from jig output that is targeted by PT. Timah for XYZ mine is 2.500 ton, while
author made model generate 3.053 ton, an excess of 553 ton is gotten. Equipment
necessity to mine XYZ mine are two excavators average for overburden and three
for ore for every year, each of which needs four untill five trucks. |
format |
Final Project |
author |
Darusman, Rosita |
spellingShingle |
Darusman, Rosita STUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK. |
author_facet |
Darusman, Rosita |
author_sort |
Darusman, Rosita |
title |
STUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK. |
title_short |
STUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK. |
title_full |
STUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK. |
title_fullStr |
STUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK. |
title_full_unstemmed |
STUDI PERENCANAAN TAMBANG ENDAPAN TIMAH PRIMER, SITE XYZ PT.TIMAH (PERSERO) TBK. |
title_sort |
studi perencanaan tambang endapan timah primer, site xyz pt.timah (persero) tbk. |
url |
https://digilib.itb.ac.id/gdl/view/69559 |
_version_ |
1822991068489056256 |