SCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE

Waikaka bridge is one of the strategic bridge and connecting three district in Seram Island. At 2019, That bridge was cut off because flooding and causing economy activity cut off. The broken bridge has been built and finished in 2021. Scour protection should bee add as preventive measure of scou...

Full description

Saved in:
Bibliographic Details
Main Author: Puspita Sari, Meliyana
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/69965
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:69965
spelling id-itb.:699652022-12-21T11:41:57ZSCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE Puspita Sari, Meliyana Indonesia Final Project Waikaka Bridge, Abutment Scouring, Alternative Design INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69965 Waikaka bridge is one of the strategic bridge and connecting three district in Seram Island. At 2019, That bridge was cut off because flooding and causing economy activity cut off. The broken bridge has been built and finished in 2021. Scour protection should bee add as preventive measure of scour control. Design of scour protection is using peak discharge 5 year return period of 756.3 m3/s and baseflow discharge of 11.49 m3/s so that the total discharge is 767.79 m3/s. The result of maximum potency scour depth is 5.16 m at left Abutment and 8.53 m at right Abutment . Alternative design will be used are Rip-rap and Gabion. The cost will be need for rip-rap is Rp.1,246,393,964 and gabion is Rp.1,766,749,192. So that for scour protection will be chosen is rip-rap. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Waikaka bridge is one of the strategic bridge and connecting three district in Seram Island. At 2019, That bridge was cut off because flooding and causing economy activity cut off. The broken bridge has been built and finished in 2021. Scour protection should bee add as preventive measure of scour control. Design of scour protection is using peak discharge 5 year return period of 756.3 m3/s and baseflow discharge of 11.49 m3/s so that the total discharge is 767.79 m3/s. The result of maximum potency scour depth is 5.16 m at left Abutment and 8.53 m at right Abutment . Alternative design will be used are Rip-rap and Gabion. The cost will be need for rip-rap is Rp.1,246,393,964 and gabion is Rp.1,766,749,192. So that for scour protection will be chosen is rip-rap.
format Final Project
author Puspita Sari, Meliyana
spellingShingle Puspita Sari, Meliyana
SCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE
author_facet Puspita Sari, Meliyana
author_sort Puspita Sari, Meliyana
title SCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE
title_short SCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE
title_full SCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE
title_fullStr SCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE
title_full_unstemmed SCOUR PROTECTION DESIGN AT WAIKAKA BRIDGE, WEST SERAM DISTRICT, MALUKU PROVINCE
title_sort scour protection design at waikaka bridge, west seram district, maluku province
url https://digilib.itb.ac.id/gdl/view/69965
_version_ 1822991201156988928