CAPITAL INVESTMENT ANALYSIS OF SLURRY PUMP IN PIT QSV1, EAST KALIMANTAN (CASE STUDY AT PT BERAU COAL)
Coal prices on the Newcastle (Australia) ICE market in March 2022 closed up 46.01% to the level of US$ 446/ton. This is the highest record since at least 2008. With this, since the beginning of the year (ytd), the price of the black stone has sky rocketed to 193.90%. Meanwhile, in the last year, the...
Saved in:
Main Author: | Riaviandhi, Dhehave |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/69977 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF MUD HANDLING USING SLURRY PUMP METHOD (CASE STUDY PIT C2 PT. BERAU COAL)
by: Ihsan Priambodo, Mohamad -
PROPOSED IMPROVEMENT STRATEGY OF COAL SUPPLY CHAIN AT PT. BERAU COAL, EAST KALIMANTAN
by: Muttakin, Oka -
INVESTMENT ANALYSIS OF LOADPRO X60 AS COAL HAULING EQUIPMENT IN PIT A, SAMBARATA MINE OPERATIONS, PT. BERAU COAL
by: Ramadinata Yantoro, William -
INVESTMENT ANALYSIS OF COAL FERTILIZER PLANT USING CAPITAL BUDGETING WITH SOCIAL RETURN ON INVESTMENT APPROACH IN PT BERAU COAL
by: Hakim, Lukman -
INVESTMENT ANALYSIS OF CRUSHING STATION 11 UPGRADE TO SUPPORT COAL PRODUCTION IN PIT Z, BINUNGAN MINE OPERATIONS, PT. BERAU COAL
by: Fadhlullah Muharam, Adnan