INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)

The coal mining industry is a costly and high-risk business that is significantly exposed to turbulence and high uncertainty. Block Parapatan in the Binungan area, part of the PKB2B Genarasi 1 area of PT. Berau Coal, is an active mining area. This project is projected as a 'green' project...

Full description

Saved in:
Bibliographic Details
Main Author: Hudiantoro, Arief
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/69984
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:69984
spelling id-itb.:699842022-12-22T09:03:51ZINVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL) Hudiantoro, Arief Manajemen umum Indonesia Theses DCF, Payback Period, IRR, Surface Miner, Probability index INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/69984 The coal mining industry is a costly and high-risk business that is significantly exposed to turbulence and high uncertainty. Block Parapatan in the Binungan area, part of the PKB2B Genarasi 1 area of PT. Berau Coal, is an active mining area. This project is projected as a 'green' project for Berau Coal, with a low-cost production profile but has challenges in the coal industry conditions in the form of uncertain external conditions that make the Block Parapatan have a mining pattern that is different from other blocks in all areas of PT. Berau coal is a material separation method using the ripping method instead of the blasting method. However, the Ripping method has limitations in its operation, especially in the planned mining depth, so continuous innovation is needed using other methods and in this case the use of the Surface Miner tool is an option for dissolving the material. Careful consideration and review of these mining patterns coupled with the volatility of coal prices, fuel prices, demand and regulations have been considered as significant challenges to be faced in the valuation of an investment in a mining project. Uncertainty in the business profile is expected to significantly affect the project's projected cash flows. Therefore it is necessary to carry out an adequate assessment. It is also deemed necessary to consider the best method or strategy as well as the flexibility of the company's management to accommodate these conditions during the project and choose the best alternative to maximize the value of the project. The method used by PT Berau Coal for the mining pattern using Surface Miner is Discounted Cash Flow (DCF). Calculations from this valuation method will be used as management judgment for mining decisions. The DCF method used on Surface Miner mining equipment in the “Block Parapatan Site Binungan” mining project is feasible to use. Because the discounted cash flow (DCF) assessment has an NPV value > 0, namely $ 101.87.0 Million, the IRR > Discount rate is 132% of the 9.61% discount rate and the Payback period is 2.3 years, shorter than the project period, i.e. 7 years and the Probability index > 1 is 2.9. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Hudiantoro, Arief
INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
description The coal mining industry is a costly and high-risk business that is significantly exposed to turbulence and high uncertainty. Block Parapatan in the Binungan area, part of the PKB2B Genarasi 1 area of PT. Berau Coal, is an active mining area. This project is projected as a 'green' project for Berau Coal, with a low-cost production profile but has challenges in the coal industry conditions in the form of uncertain external conditions that make the Block Parapatan have a mining pattern that is different from other blocks in all areas of PT. Berau coal is a material separation method using the ripping method instead of the blasting method. However, the Ripping method has limitations in its operation, especially in the planned mining depth, so continuous innovation is needed using other methods and in this case the use of the Surface Miner tool is an option for dissolving the material. Careful consideration and review of these mining patterns coupled with the volatility of coal prices, fuel prices, demand and regulations have been considered as significant challenges to be faced in the valuation of an investment in a mining project. Uncertainty in the business profile is expected to significantly affect the project's projected cash flows. Therefore it is necessary to carry out an adequate assessment. It is also deemed necessary to consider the best method or strategy as well as the flexibility of the company's management to accommodate these conditions during the project and choose the best alternative to maximize the value of the project. The method used by PT Berau Coal for the mining pattern using Surface Miner is Discounted Cash Flow (DCF). Calculations from this valuation method will be used as management judgment for mining decisions. The DCF method used on Surface Miner mining equipment in the “Block Parapatan Site Binungan” mining project is feasible to use. Because the discounted cash flow (DCF) assessment has an NPV value > 0, namely $ 101.87.0 Million, the IRR > Discount rate is 132% of the 9.61% discount rate and the Payback period is 2.3 years, shorter than the project period, i.e. 7 years and the Probability index > 1 is 2.9.
format Theses
author Hudiantoro, Arief
author_facet Hudiantoro, Arief
author_sort Hudiantoro, Arief
title INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
title_short INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
title_full INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
title_fullStr INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
title_full_unstemmed INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
title_sort investment project analysis of surface miners method block parapatan site binungan (case study : pt berau coal)
url https://digilib.itb.ac.id/gdl/view/69984
_version_ 1822991210747265024