INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
The coal mining industry is a costly and high-risk business that is significantly exposed to turbulence and high uncertainty. Block Parapatan in the Binungan area, part of the PKB2B Genarasi 1 area of PT. Berau Coal, is an active mining area. This project is projected as a 'green' project...
Saved in:
Main Author: | Hudiantoro, Arief |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/69984 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF PT. BERAU COAL BLOCK 5-6 BINUNGAN USING DISCOUNTED CASH FLOW METHOD
by: Ilham Mury Nanda, Ridho -
SOCIAL RETURN ON INVESTMENT (SROI) OF WATER TREATMENT PLANT FROM VOID H3 SITE BINUNGAN IN PT BERAU COAL
by: Kirmi, Hifzil -
INVESTMENT PROJECT ANALYSIS THE CASE OF BINUNGAN BLOCK 10 MINE PROJECT
by: Irwan, Maurys -
INVESTMENT ANALYSIS OF CRUSHING STATION 11 UPGRADE TO SUPPORT COAL PRODUCTION IN PIT Z, BINUNGAN MINE OPERATIONS, PT. BERAU COAL
by: Fadhlullah Muharam, Adnan -
INVESTMENT PROJECT ANALYSIS OF PT BERAU COAL BLOCK A, BLOCK B AND BLOCK C COAL MINING PROJECT USING DISCOUNTED CASH FLOW METHOD
by: Wayan Supriharta, Ida