PRE-ORDER SCHEDULING THAT CONSIDERING READY TIME MACHINE BY USING INTERNET OF THINGS

CV Cipta Sinergi Manufacturing (CSM) is a Make-to-Order (MTO) company who engaged in production of machinery products. Currently, the company has problems with on time delivery, which is 76% with a target of 80%. One of the causes of the delay is the poor production scheduling system at CV CSM. When...

Full description

Saved in:
Bibliographic Details
Main Author: Zuhdi Faturrahman, M.
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/70221
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia