PRE-ORDER SCHEDULING THAT CONSIDERING READY TIME MACHINE BY USING INTERNET OF THINGS
CV Cipta Sinergi Manufacturing (CSM) is a Make-to-Order (MTO) company who engaged in production of machinery products. Currently, the company has problems with on time delivery, which is 76% with a target of 80%. One of the causes of the delay is the poor production scheduling system at CV CSM. When...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/70221 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |