PRE-ORDER SCHEDULING THAT CONSIDERING READY TIME MACHINE BY USING INTERNET OF THINGS
CV Cipta Sinergi Manufacturing (CSM) is a Make-to-Order (MTO) company who engaged in production of machinery products. Currently, the company has problems with on time delivery, which is 76% with a target of 80%. One of the causes of the delay is the poor production scheduling system at CV CSM. When...
Saved in:
Main Author: | Zuhdi Faturrahman, M. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/70221 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Securing the Internet of Things using machine learning
by: Ilango, Harun Surej
Published: (2022) -
Defending Forward : Pre-emption in the Internet of Things
by: Lohaus, Phillip
Published: (2019) -
SCHEDULING THREE-STAGE HYBRID FLOWSHOP BY CONSIDERING LEAD TIME OF SPARE PARTS ORDERING, FIXED TECHNICIAN AND DEDICATED MACHINE TO MINIMIZE MAKESPAN
by: Windhi P, Oktifian -
Device scheduling and assignment in hierarchical federated learning for Internet of Thing
by: Zhang, Tinghao, et al.
Published: (2024) -
Using machine learning to detect vulnerabilities in Internet of Things (IoT) devices
by: Yong, Li Yao
Published: (2024)