DRILLING INVESTMENT ANALYSIS OF THE NEW WELL DESIGN WITH SHALLOW OPTI-LIGHT ARCHITECTURE (SOLA) AT TUNUS FIELD, MAHAKAS BLOCK, EAST KALIMANTAN
The TUNUS field in the MAHAKAS Block is a giant gas field located in East Kalimantan, Indonesia and operated by MAHAENERGY. The TUNUS field is one of the fields from MAHAENERGY which has been developed for more than 30 years since 1990 and is currently facing a production decline phase. One of the e...
Saved in:
Main Author: | Surya Nusantara Manalu, Dasa |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/70327 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSES OF GEOMECHANICAL PARAMETER IN STABILITY OF THE WELL DRILLING PROCESS AT TUNU SHALLOW ZONE
by: Hardita, Dimas -
The use of SOLAS ship security alert systems
by: Timlen, Thomas
Published: (2009) -
PROJECT FEASIBILITY AND SENSITIVITY ANALYSIS OF MENILO-26 INFILL WELL DRILLING IN SOKO BLOCK
by: Richardie, Rafi -
Komunikasi serat optis
by: Perpustakaan UGM, i-lib
Published: (1992) -
OPTIMIZING DRILLING COST THROUGH THE APPLICATION OF HYDRAULIC WORKOVER UNIT TO DRILL NEW WELLS IN ANDALAN DELTA
by: Ryan Aditya Surya Wijaya, Raden