DRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN

Gas Machine Power Plant Bangkanai was built above 5 acre land in Sub-District Lahei, North Barito Regency, Central Kalimantan. Around power plant there wasn’t any storage that could contain run-off water from rain. Therefore i tis necessary to build water pond to contain all the run-off water. Th...

Full description

Saved in:
Bibliographic Details
Main Author: Laksmono, Kenneth
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/70859
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:70859
spelling id-itb.:708592023-01-24T10:57:03ZDRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN Laksmono, Kenneth Indonesia Final Project water pond, drainage system, hydrograph, current-breaker structure, ladder structure, pump. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/70859 Gas Machine Power Plant Bangkanai was built above 5 acre land in Sub-District Lahei, North Barito Regency, Central Kalimantan. Around power plant there wasn’t any storage that could contain run-off water from rain. Therefore i tis necessary to build water pond to contain all the run-off water. The power plant already has drainase system which need to be evaluated for its performance. The return period used to calculate the run-off is 2 years and using Log Pearson-III Method. The hydrograph is obtained from SWMM modelling with 4 hours of rain. The result of the modelling is all sewer can contain the flood but there is some sewer which has velocity above maximum velocity. Based on the modelling result it is required to build current-breaker structure to slow down the velocity. Due to the steep land, there is also ladder structure between sewer BB4-B and B-Outlet. The water pond has total volume of 8.773,52 m3, large enough to contain the total runoff volume of 6.183,00 m3 with the condition that the poo lis empty. The water surface of the pool is kept at 1,50 m depth. There is a pump at water pond to help control the water elevation inside the pond. In case the water is flooding, the pump will wash the water into road drainage in the northwest side of the power plant text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Gas Machine Power Plant Bangkanai was built above 5 acre land in Sub-District Lahei, North Barito Regency, Central Kalimantan. Around power plant there wasn’t any storage that could contain run-off water from rain. Therefore i tis necessary to build water pond to contain all the run-off water. The power plant already has drainase system which need to be evaluated for its performance. The return period used to calculate the run-off is 2 years and using Log Pearson-III Method. The hydrograph is obtained from SWMM modelling with 4 hours of rain. The result of the modelling is all sewer can contain the flood but there is some sewer which has velocity above maximum velocity. Based on the modelling result it is required to build current-breaker structure to slow down the velocity. Due to the steep land, there is also ladder structure between sewer BB4-B and B-Outlet. The water pond has total volume of 8.773,52 m3, large enough to contain the total runoff volume of 6.183,00 m3 with the condition that the poo lis empty. The water surface of the pool is kept at 1,50 m depth. There is a pump at water pond to help control the water elevation inside the pond. In case the water is flooding, the pump will wash the water into road drainage in the northwest side of the power plant
format Final Project
author Laksmono, Kenneth
spellingShingle Laksmono, Kenneth
DRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN
author_facet Laksmono, Kenneth
author_sort Laksmono, Kenneth
title DRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN
title_short DRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN
title_full DRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN
title_fullStr DRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN
title_full_unstemmed DRAINAGE SYSTEM PERFORMANCE EVALUATION AND WATER POND DESIGN FOR GAS MACHINE POWER PLANT IN BANGKANAI, CENTRAL KALIMANTAN
title_sort drainage system performance evaluation and water pond design for gas machine power plant in bangkanai, central kalimantan
url https://digilib.itb.ac.id/gdl/view/70859
_version_ 1822278882632400896