INVESTMENT PROJECT ANALYSIS OF PT. BERAU COAL BLOCK 5-6 BINUNGAN USING DISCOUNTED CASH FLOW METHOD
The evaluation of business projects that have high complexity and uncertainty will require a thorough study since the coal mining industry is a business that has extremely high costs as well as a high risk where there are many uncertainty elements that impact this sector. Blocks 5 and 6 are loca...
Saved in:
Main Author: | Ilham Mury Nanda, Ridho |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/71154 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF PT BERAU COAL BLOCK A, BLOCK B AND BLOCK C COAL MINING PROJECT USING DISCOUNTED CASH FLOW METHOD
by: Wayan Supriharta, Ida -
INVESTMENT PROJECT ANALYSIS PIT CACD BLOCK 8 , USING DISCOUNTED CASH FLOW (DCF) (CASE STUDY OF PT. BERAU COAL)
by: Zea Ardiansyah, Pandu -
INVESTMENT PROJECT ANALYSIS OF SURFACE MINERS METHOD BLOCK PARAPATAN SITE BINUNGAN (CASE STUDY : PT BERAU COAL)
by: Hudiantoro, Arief -
INVESTMENT PROJECT ANALYSIS PIT C2 BLOCK 8 USING DISCOUNTED CASH FLOW (DCF) & REAL OPTIONS VALUATION (ROV) (CASE STUDY OF PT.BERAU COAL)
by: Bahri S, Syamsul -
INVESTMENT PROJECT ANALYSIS OF PTBC BLOCK 9 COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Prio Prakoso, Anjas