SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.

Open pit mining creates former pits that can be used as post-mining lakes or are known as pit lakes. However, the filling of post-mining lakes with rainwater and river water is still rarely done in Indonesia. Therefore, predicting the formation of mining lakes by simulating the rate and duration...

Full description

Saved in:
Bibliographic Details
Main Author: Wulandari, Diah
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/71187
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:71187
spelling id-itb.:711872023-01-28T06:43:56ZSIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN. Wulandari, Diah Indonesia Theses acid mine water, pit lake, filling, river water INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/71187 Open pit mining creates former pits that can be used as post-mining lakes or are known as pit lakes. However, the filling of post-mining lakes with rainwater and river water is still rarely done in Indonesia. Therefore, predicting the formation of mining lakes by simulating the rate and duration of water filling with rainwater and river water can be one of the references or guidelines for reclamation of mining lakes in Indonesia. This study is conducted at Binungan 01 site of D2 pit, a mining area of PT. Berau Coal, which is located between two rivers, the Kelay River and the Binungan River. These two rivers have high water discharge, which is 930.60 m³/s to 1539.2 m³/s with a flow rate of 0.540 m/s (Kelay River) and 117.39 m³/s to 304.30 m³/s with a flow rate of 0.608 m/s (Binungan River). The filling simulation is carried out under two assumptions, namely continuous or throughout and the assumption of filling by flood discharge. The two simulations resulted in the conclusion that the Kelay River needs 18 months to fill the mining lake, assuming that the filling is continuous with a river discharge of 2 m³/s. In contrast, the filling simulation based on flood discharge requires 16 months to fill the lake at a discharge of 2.75 m³/s. The results of the Kelay River simulation are considered more effective, while the Binungan River takes 25 months to fill at a discharge of 1.5 m³/s assuming continuous flow, and 18 months to fill at a discharge of 1.85 m³/s assuming flood flow. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Open pit mining creates former pits that can be used as post-mining lakes or are known as pit lakes. However, the filling of post-mining lakes with rainwater and river water is still rarely done in Indonesia. Therefore, predicting the formation of mining lakes by simulating the rate and duration of water filling with rainwater and river water can be one of the references or guidelines for reclamation of mining lakes in Indonesia. This study is conducted at Binungan 01 site of D2 pit, a mining area of PT. Berau Coal, which is located between two rivers, the Kelay River and the Binungan River. These two rivers have high water discharge, which is 930.60 m³/s to 1539.2 m³/s with a flow rate of 0.540 m/s (Kelay River) and 117.39 m³/s to 304.30 m³/s with a flow rate of 0.608 m/s (Binungan River). The filling simulation is carried out under two assumptions, namely continuous or throughout and the assumption of filling by flood discharge. The two simulations resulted in the conclusion that the Kelay River needs 18 months to fill the mining lake, assuming that the filling is continuous with a river discharge of 2 m³/s. In contrast, the filling simulation based on flood discharge requires 16 months to fill the lake at a discharge of 2.75 m³/s. The results of the Kelay River simulation are considered more effective, while the Binungan River takes 25 months to fill at a discharge of 1.5 m³/s assuming continuous flow, and 18 months to fill at a discharge of 1.85 m³/s assuming flood flow.
format Theses
author Wulandari, Diah
spellingShingle Wulandari, Diah
SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
author_facet Wulandari, Diah
author_sort Wulandari, Diah
title SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
title_short SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
title_full SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
title_fullStr SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
title_full_unstemmed SIMULATION OF FILLING IN EX-MINE HOLE, PIT D2 SITE BINUNGAN 01 PT. BERAU COAL, EAST KALIMANTAN.
title_sort simulation of filling in ex-mine hole, pit d2 site binungan 01 pt. berau coal, east kalimantan.
url https://digilib.itb.ac.id/gdl/view/71187
_version_ 1822992029022420992