STABILITY AND SEEPAGE EVALUATION OF CIAWI DRY DAM

The Ministry of Public Works and Housing has been constructing Ciawi Dry Dam that located in the upstream of Ciliwung River, Bogor, West Java, as one of the flood mitigation method in Jakarta. The dam will be used as temporary reservoir so the water from the upstream of Ciliwung River will be stored...

Full description

Saved in:
Bibliographic Details
Main Author: Qinthara Aghnat, Muhammad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/71570
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:The Ministry of Public Works and Housing has been constructing Ciawi Dry Dam that located in the upstream of Ciliwung River, Bogor, West Java, as one of the flood mitigation method in Jakarta. The dam will be used as temporary reservoir so the water from the upstream of Ciliwung River will be stored until the specified water level. After several days they will be released through the downstream. The design of this dam is using embankment dam with inclined core, so it is possible for water to seep through the dam. Therefore, this dam has several potential failures such as slope instability, piping, and uplift. To evaluate those failure potentials, coupled analysis should be done using SEEP/W and SLOPE/W that provided in GeoStudio 2012. The application of dynamic conditions is carried out using the pseudostatic method. In earthquake conditions with a high return period, the dam is allowed to undergo post-earthquake deformation that should be evaluated according to requirements.