DEVELOPMENT OF LEAN LINE TRANSFORMATION TO REDUCE GAS TURBINE PART REPAIR LEAD TIME (A CASE OF PT. XYZ)

As the gas turbine market business will grow significantly by 6.2% from 2022 to 2030 globally and will grow 4.9% per annum from 2021 until 2030 in Indonesia with new gas turbine power plant new install base will grow until 5.7 GW in 2030. Thus, PT XYZ as a Gas Turbine repair centre of excellence sha...

Full description

Saved in:
Bibliographic Details
Main Author: Mahmudi, Wakid
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/71904
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first