DEVELOPMENT OF LEAN LINE TRANSFORMATION TO REDUCE GAS TURBINE PART REPAIR LEAD TIME (A CASE OF PT. XYZ)
As the gas turbine market business will grow significantly by 6.2% from 2022 to 2030 globally and will grow 4.9% per annum from 2021 until 2030 in Indonesia with new gas turbine power plant new install base will grow until 5.7 GW in 2030. Thus, PT XYZ as a Gas Turbine repair centre of excellence sha...
Saved in:
Main Author: | Mahmudi, Wakid |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/71904 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
NEW PRODUCT LINE CREATION AND LINE STOP RESOLUTION METHOD USING LEAN PRINCIPLES (A CASE OF PT. XYZ)
by: Afriyanti, Fitri -
INVESTMENT ANALYSIS OF GAS TURBINE COMBINED CYCLE TO REDUCE THE PRODUCTION COST OF PT XYZ: CASE STUDY IPP OF PT PLN BATAM
by: Kirana -
PROPOSED GROWTH STRATEGY FOR PT TAKA TURBO IN GAS TURBINE REPAIR INDUSTRY USING CAPITAL BUDGETING APPROACH
by: Qashmal, Luthfan -
ACCELERATING THE DIGITAL TRANSFORMATION OF BANK XYZ
by: Syana Ansaraini Putri Akbar, R. -
QUALITY IMPROVEMENT TO ENHANCE CONSUMER SATISFACTION USING LEAN SIX SIGMA (CASE STUDY: XYZ RESTAURANT)
by: Naufal Djatmiko, Dimas