CAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA)

Over the past five years, demand for food and beverage needs has decreased due to the COVID-19 pandemic, but in 2021, demand returned, and the food and beverage industry has begun to recover. Packaged beverages in Indonesia are diverse, ranging from coffee tea, and others. Companies that produce...

Full description

Saved in:
Bibliographic Details
Main Author: Rahmanul Azis, Hadi
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/71947
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:71947
spelling id-itb.:719472023-02-28T13:51:27ZCAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA) Rahmanul Azis, Hadi Manajemen umum Indonesia Theses Capacity, Capacity Planning, Payback Period, Production INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/71947 Over the past five years, demand for food and beverage needs has decreased due to the COVID-19 pandemic, but in 2021, demand returned, and the food and beverage industry has begun to recover. Packaged beverages in Indonesia are diverse, ranging from coffee tea, and others. Companies that produce various types of drinks, such as private or state-owned companies, also vary. In particular, PT Perkebunan Nusantara VIII makes multiple kinds of tea, such as black tea, white tea, and green tea. In early 2021 PTPN VIII began producing a new product based on consumer demand, namely oolong tea, within an estimated contract worth IDR 40,000 per Kg of 150 tons. Thus, the firm should be prepared related to the garden and the factory to produce the oolong tea. This research uses a quantitative descriptive method by analyzing the capacity of the garden to provide the raw material for oolong tea; in the process of oolong tea production, the garden can provide 2.5 tons per day, exceeding the calculation of 1.9 tons. However, the machine used for the production process is inadequate. The machine's capacity is only available to produce 94,86 tons per year, which is below consumer demand. It requires the firm to add three rotary dryer machines. Adding three machines meant oolong tea production reached 150 tons only in 13 hours and 25 minutes. Adding these machines also requires the firm to invest as much as Rp 540,000,000; by this investment value of the machine, the payback period will return in 4,4 years with the machine durability more than 25 years text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Rahmanul Azis, Hadi
CAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA)
description Over the past five years, demand for food and beverage needs has decreased due to the COVID-19 pandemic, but in 2021, demand returned, and the food and beverage industry has begun to recover. Packaged beverages in Indonesia are diverse, ranging from coffee tea, and others. Companies that produce various types of drinks, such as private or state-owned companies, also vary. In particular, PT Perkebunan Nusantara VIII makes multiple kinds of tea, such as black tea, white tea, and green tea. In early 2021 PTPN VIII began producing a new product based on consumer demand, namely oolong tea, within an estimated contract worth IDR 40,000 per Kg of 150 tons. Thus, the firm should be prepared related to the garden and the factory to produce the oolong tea. This research uses a quantitative descriptive method by analyzing the capacity of the garden to provide the raw material for oolong tea; in the process of oolong tea production, the garden can provide 2.5 tons per day, exceeding the calculation of 1.9 tons. However, the machine used for the production process is inadequate. The machine's capacity is only available to produce 94,86 tons per year, which is below consumer demand. It requires the firm to add three rotary dryer machines. Adding three machines meant oolong tea production reached 150 tons only in 13 hours and 25 minutes. Adding these machines also requires the firm to invest as much as Rp 540,000,000; by this investment value of the machine, the payback period will return in 4,4 years with the machine durability more than 25 years
format Theses
author Rahmanul Azis, Hadi
author_facet Rahmanul Azis, Hadi
author_sort Rahmanul Azis, Hadi
title CAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA)
title_short CAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA)
title_full CAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA)
title_fullStr CAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA)
title_full_unstemmed CAPACITY PLANNING OF NEW PRODUCT IN PT PERKEBUNAN NUSANTARA VIII (OOLONG TEA)
title_sort capacity planning of new product in pt perkebunan nusantara viii (oolong tea)
url https://digilib.itb.ac.id/gdl/view/71947
_version_ 1822992339943030784