OPTIMIZATION CONSTRUCTION OF DRILLING PREPARATION WITH SIX SIGMA QUALITY METHOD (STUDY CASE AT PERTAMINA EP R3 Z10 BUNYU FIELD)
The event of Company’s re-organization where the previous team who handled the Drilling preparation work on RK 2021 was moved from the Bunyu EP5 area and no proper handover to the new team, including the work contracts of heavy equipment and preparation of drilling area. RK 2022 of Drilling work whe...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/72177 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |