TECHNICAL DESIGN OF WATER INFRASTRUCTURE FOR MINI HYDRO ELECTRICAL POWER GENERATION (MHEP) PEKATAN ON WEST LOMBOK, NTB.
This paper discuss a study of stream flow utilization as an alternative energy resources for mini hydro electrical power generation (MHEP). Case study taken in this analysis is carried out at Segare river basin, locate in Pekatan, Tanjung Sub District, West Lombok District, NTB Province. It is e...
Saved in:
Main Author: | Intamani, Amigia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/72877 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TECHNICAL DESIGN OF WATER INFRASTRUCTURE FOR MINI HYDRO ELECTRICAL POWER GENERATION (MHEP) PEKATAN ON WEST LOMBOK, NTB
by: Nidiasyah Agradini, Poppi -
PLANNING OF CIPANDAK MINI HYDRO POWER PLANT IN CIANJUR DISTRICT, WEST JAVA PROVINCE
by: Anggi Sapriadi, Moch. -
PLANNING OF GUMANTI MINI HYDRO POWER PLANT (MHPP), SOLOK REGENCY, WEST SUMATERA
by: Prahasta, Deustin -
Self-excited single-phase induction generators for mini-hydro systems
by: Soon, Peggy Pei Yi.
Published: (2009) -
Aplikasi model hidrologi ketersediaan air untuk perbaikan sistem operasi irigasi :: Studi kasus pada DAS Pekatan Lombok Barat
by: ABDULLAH, Sirajuddin Haji
Published: (2000)