FEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG

The district air conditioning and hot water supplying system, also known as the district energy system, is an alternative to the currently available systems to fulfill the human needs for comfort. This research is carried out to study the investment feasibilty for a designed district energy sytem th...

Full description

Saved in:
Bibliographic Details
Main Author: FERDINI MEILIANI (NIM 13103083), ASTRID
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/7347
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:7347
spelling id-itb.:73472017-09-27T10:41:01ZFEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG FERDINI MEILIANI (NIM 13103083), ASTRID Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/7347 The district air conditioning and hot water supplying system, also known as the district energy system, is an alternative to the currently available systems to fulfill the human needs for comfort. This research is carried out to study the investment feasibilty for a designed district energy sytem that is desired to save energy and expenses. A cost-benefit analysis of the district energy system is conducted then to be compared with those of conventional systems. The energy's selling price is based on the savings achieved by district systems, therefore the customers will obtain a much more economical charge compared to the conventional system. The selling price for the district air conditioning system is fixed at Rp. 330.000,00 per month per TR, while the selling price for the district hot water system is rated at Rp. 26,00 per litre. Based on annual cash flow derived from profit results after tax, an investment feasibility analysis is done with several methods. Analysis results shows four years payback period and break even point can be attained after the fifth year; while for the project's final age, after 20 years; a Net Present Value of Rp.178.404.125.470,03, Internal Rate Return of 33%, and a profitability index of 3,986 is acquired, hence the system is considered feasible to be applicated. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The district air conditioning and hot water supplying system, also known as the district energy system, is an alternative to the currently available systems to fulfill the human needs for comfort. This research is carried out to study the investment feasibilty for a designed district energy sytem that is desired to save energy and expenses. A cost-benefit analysis of the district energy system is conducted then to be compared with those of conventional systems. The energy's selling price is based on the savings achieved by district systems, therefore the customers will obtain a much more economical charge compared to the conventional system. The selling price for the district air conditioning system is fixed at Rp. 330.000,00 per month per TR, while the selling price for the district hot water system is rated at Rp. 26,00 per litre. Based on annual cash flow derived from profit results after tax, an investment feasibility analysis is done with several methods. Analysis results shows four years payback period and break even point can be attained after the fifth year; while for the project's final age, after 20 years; a Net Present Value of Rp.178.404.125.470,03, Internal Rate Return of 33%, and a profitability index of 3,986 is acquired, hence the system is considered feasible to be applicated. <br />
format Final Project
author FERDINI MEILIANI (NIM 13103083), ASTRID
spellingShingle FERDINI MEILIANI (NIM 13103083), ASTRID
FEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG
author_facet FERDINI MEILIANI (NIM 13103083), ASTRID
author_sort FERDINI MEILIANI (NIM 13103083), ASTRID
title FEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG
title_short FEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG
title_full FEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG
title_fullStr FEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG
title_full_unstemmed FEASIBILITY STUDY OF DISTRICT AIR CONDITIONING AND HOT WATER SUPPLYING SYSTEM APPLICATION AT BATUNUNGGAL INDAH ESTATE BANDUNG
title_sort feasibility study of district air conditioning and hot water supplying system application at batununggal indah estate bandung
url https://digilib.itb.ac.id/gdl/view/7347
_version_ 1820664129253277696