STAKEHOLDER ANALYSIS APPROACH IN THE DEVELOPMENT OF TRANSPORTATION INFRASTRUCTURE MEGAPROJECT AT PATIMBAN PORT, SUBANG REGENCY, WEST JAVA PROVINCE
The development of a transportation infrastructure megaproject is a large-scale system, both in terms of physical dimensions and funding, and is equipped with components with complex relationships or interrelationships. The components include reach, duration, cost, movement and risk, various acto...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/73513 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | The development of a transportation infrastructure megaproject is a large-scale
system, both in terms of physical dimensions and funding, and is equipped with
components with complex relationships or interrelationships. The components
include reach, duration, cost, movement and risk, various actors, controversial, rules
and values. One of these components has an important role in the successful
development of a transportation infrastructure megaproject, namely the stakeholders
involved. Stakeholders themselves include individuals and organizations that have a
role and involvement in carrying out or influencing the implementation of a
transportation infrastructure megaproject development. Therefore, analysis and
analysis of the role and involvement of stakeholders involved in the implementation
of the development of transportation infrastructure megaprojects is important for the
implementation of the development of transportation infrastructure megaprojects so
that it can occur properly. The construction of the Patimban Port transportation
infrastructure mega project is one of the projects that have been designated as a
National Strategic Project located in Subang Regency, West Java Province. The
construction of the transportation infrastructure megaproject at Patimban Port
consists of three stages involving stakeholders from various groups, both domestic
and foreign, through a foreign grant cooperation scheme from the Japan International
Cooperation Agency (JICA).
This study aims to find out the stakeholders involved, the roles of the stakeholders,
the patterns of interaction between stakeholders, and to assess the level of interest
and level of strength of the various stakeholders involved in the construction of a
transportation infrastructure megaproject at Patimban Port. For this reason, various
analytical approaches are used, including descriptive analysis methods, content
analysis, social network analysts with UCINET software, and a power versus interest
matrix. The results of this study indicate that the Patimban Port transportationiv
infrastructure megaproject is currently still in the construction or construction stage
which is targeted to be completed in 2027, but has now started operating partially
since 2020. The implementation of its construction involves various stakeholders
including elements of the government , non-government, and foreign parties.
Stakeholders who have key roles with a high level of interest and power are
dominated by the central government, but this is inseparable from the support and
cooperation of all stakeholders involved in the implementation of the construction of
the Patimban Port transportation infrastructure megaproject. |
---|