SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL

Indonesia as a developing country, continues to implement various strategic action to increase economic activities through infrastructure development named National Strategic Project that are considered strategic and have high urgency to be realized in a short period of time. To fulfill the PSN, PT...

Full description

Saved in:
Bibliographic Details
Main Author: Rino, Minaco
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/73598
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:73598
spelling id-itb.:735982023-06-21T16:01:46ZSCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL Rino, Minaco Indonesia Theses Contract Strategy Scheme, OTOBOSOROR, PESTEL Analysis, Scenario Planning. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/73598 Indonesia as a developing country, continues to implement various strategic action to increase economic activities through infrastructure development named National Strategic Project that are considered strategic and have high urgency to be realized in a short period of time. To fulfill the PSN, PT KPI has goal namely OTOBOSOROR (On Time, On Budget, On Schedule, On Regulation, On Return) where there are still many project delays, cost overrun or under specification. Therefore, one of the main goals of the project is a fast-tracking strategy in developing projects to achieve earlier project completion with lower Capex and meet owner specification. However, in fast-track projects, starting an activity without comprehensive data and knowledge entails additional risks and uncertainties than in typical project. Therefore, the author will assess appropriate scenario planning for future contract strategy scheme to achieve OTOBOSOROR target by exploring the internal organization as well as the external environment using McKinsey’s 7S and PESTEL. Then, scenario planning analysis will be conducted where’s ten driving forces are identified and analyzed. Four scenarios are created from crucial uncertainties by combining the important variables of project scheduling and project cost. Implications and options are arranged for the respective scenario. At the end this study proposes Design Build Competition (DBC) contract strategy concept to complete the fast-tracking strategy, reduce project costs and maintain owner specification. However before initiating an activity, PT KPI should manage all risks and uncertainties in fast-track initiatives to avoid potential events that are not beneficial for future PT KPI projects. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia as a developing country, continues to implement various strategic action to increase economic activities through infrastructure development named National Strategic Project that are considered strategic and have high urgency to be realized in a short period of time. To fulfill the PSN, PT KPI has goal namely OTOBOSOROR (On Time, On Budget, On Schedule, On Regulation, On Return) where there are still many project delays, cost overrun or under specification. Therefore, one of the main goals of the project is a fast-tracking strategy in developing projects to achieve earlier project completion with lower Capex and meet owner specification. However, in fast-track projects, starting an activity without comprehensive data and knowledge entails additional risks and uncertainties than in typical project. Therefore, the author will assess appropriate scenario planning for future contract strategy scheme to achieve OTOBOSOROR target by exploring the internal organization as well as the external environment using McKinsey’s 7S and PESTEL. Then, scenario planning analysis will be conducted where’s ten driving forces are identified and analyzed. Four scenarios are created from crucial uncertainties by combining the important variables of project scheduling and project cost. Implications and options are arranged for the respective scenario. At the end this study proposes Design Build Competition (DBC) contract strategy concept to complete the fast-tracking strategy, reduce project costs and maintain owner specification. However before initiating an activity, PT KPI should manage all risks and uncertainties in fast-track initiatives to avoid potential events that are not beneficial for future PT KPI projects.
format Theses
author Rino, Minaco
spellingShingle Rino, Minaco
SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL
author_facet Rino, Minaco
author_sort Rino, Minaco
title SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL
title_short SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL
title_full SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL
title_fullStr SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL
title_full_unstemmed SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL
title_sort scenario planning in selecting contract strategy scheme to achieve otobosoror (on time on budget on specification on regulation and on return) target in pt kilang pertamina internasional
url https://digilib.itb.ac.id/gdl/view/73598
_version_ 1822993168787832832