SCENARIO PLANNING IN SELECTING CONTRACT STRATEGY SCHEME TO ACHIEVE OTOBOSOROR (ON TIME ON BUDGET ON SPECIFICATION ON REGULATION AND ON RETURN) TARGET IN PT KILANG PERTAMINA INTERNASIONAL
Indonesia as a developing country, continues to implement various strategic action to increase economic activities through infrastructure development named National Strategic Project that are considered strategic and have high urgency to be realized in a short period of time. To fulfill the PSN, PT...
Saved in:
Main Author: | Rino, Minaco |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/73598 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
SCENARIO PLANNING OF THE SUSTAINABLE AVIATION FUEL (SAF) PRODUCT DEVELOPMENT AT PT. KILANG PERTAMINA INTERNASIONAL
by: Prayitno -
Strategi Outsourcing jasa pemeliharaan kilang minyak Pertamina unit pengolahan IV Cilacap
by: , ATIHUTA, Pierre V, et al.
Published: (2003) -
PORT OPERATION DESIGN OF SPECIAL TERMINAL FOR LNG IN KILANG TUBAN - PT PERTAMINA (PERSERO)
by: Roudhotul Jannah, Asri -
KEPNER-TREGOE PROBLEM ANALYSIS AND ANALYTIC HIERARCHY PROCESS TO SELECT THE BEST SOLUTION FOR SINGLE POINT MOORING (SPM) AT PT KILANG PERTAMINA INTERNASIONAL REFINERY UNIT VI BALONGAN
by: Apriyadi, Dedy -
DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL
by: Mulyadi, Hendrikawan