STABILITY ANALYSIS OF DEEP EXCAVATION IN JAKARTA MRT STATION
Construction of underground structure is complex work. The unloading process carried out during construction can change the stability that occurs. This report discusses about analysis of excavation that located in Mangga Besar MRT Station. The project has an excavation depth 30.8 m and a width of 14...
Saved in:
Main Author: | Khaedar Nuridwan Putra, Kevin |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/74644 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
TRANSIENT ANALYSIS OF DEEP EXCAVATION IN JAKARTA MRT STATION
by: Khaedar Nuridwan Putra, Kevin -
Deep excavation at the millenia MRT station
by: Wang, Yong Jie.
Published: (2008) -
THE IMPACT OF DIAPHRAGM WALL PENETRATION DEPTH ON EXCAVATION STABILITY FOR THE MRT STATION PROJECT
by: Aji Abdilla, Muhammad -
EFFECT OF D-WALL PENETRATION DEPTH ON RETAINING WALL STABILITY IN MRT DEEP EXCAVATION IN JAKARTA CITY
by: Dwi Lestari Salamah, Mirna -
EVALUATION OF THE EFFECTIVENESS OF INJECTION WELLS FOR THE THAMRIN-MONAS MRT JAKARTA UNDERGROUND STATION EXCAVATION
by: Rustica Absari, Hirundini