VENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE

PT XYZ underground mine conducts its mining using the cut and fill method. Ventilation is very important in underground mining operations, as it provides fresh air for workers and equipment. The surface temperature of the mine site is close to the standard limit of 26.2°C, where the upper limit o...

Full description

Saved in:
Bibliographic Details
Main Author: Andrew Purba, David
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75089
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:75089
spelling id-itb.:750892023-07-25T10:03:45ZVENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE Andrew Purba, David Indonesia Final Project Effective Temperature, Autocompression, Drilling, Mucking, Hauling, Spot Cooler INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75089 PT XYZ underground mine conducts its mining using the cut and fill method. Ventilation is very important in underground mining operations, as it provides fresh air for workers and equipment. The surface temperature of the mine site is close to the standard limit of 26.2°C, where the upper limit of KepDirJen Minerba No.185.K/37.04/DJB/2019 is 27°C. The activities studied are drilling, mucking, and hauling. The heat sources taken into account are geothermal gradient, autocompression, human metabolism, diesel engines, and electric engines. Incoming air temperature is very influential where there will be an increase of at least 1.68% (April and May) and a maximum of 8.56% (December and May), so it needs to be anticipated. The equipment used in drilling activities are 47 kW jumbo drill, 40 kW charging equipment, 20.5 kW auxiliary fan, and in mucking and hauling activities 2 120 kW LHDs, 120 kW mine truck, and 20.5 kW auxiliary fan are used. The problem of thermal conditions due to heat sources in drilling activities increases the temperature by 11% at the working face and in mucking and hauling activities by 15% at the working face. Heat control strategies with engineering controls, namely using a ventilation system with the exhausting system method with force overlap with a discharge of 20 m³/s, and a spot cooler cooling system with a refrigeration power of 260 kW in mucking and hauling activities, and 180 kW in drilling activities, in order to meet the regulations of KepDirJen Minerba No.185.K/37.04/DJB/2019, which is in the range of 18-27°C. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT XYZ underground mine conducts its mining using the cut and fill method. Ventilation is very important in underground mining operations, as it provides fresh air for workers and equipment. The surface temperature of the mine site is close to the standard limit of 26.2°C, where the upper limit of KepDirJen Minerba No.185.K/37.04/DJB/2019 is 27°C. The activities studied are drilling, mucking, and hauling. The heat sources taken into account are geothermal gradient, autocompression, human metabolism, diesel engines, and electric engines. Incoming air temperature is very influential where there will be an increase of at least 1.68% (April and May) and a maximum of 8.56% (December and May), so it needs to be anticipated. The equipment used in drilling activities are 47 kW jumbo drill, 40 kW charging equipment, 20.5 kW auxiliary fan, and in mucking and hauling activities 2 120 kW LHDs, 120 kW mine truck, and 20.5 kW auxiliary fan are used. The problem of thermal conditions due to heat sources in drilling activities increases the temperature by 11% at the working face and in mucking and hauling activities by 15% at the working face. Heat control strategies with engineering controls, namely using a ventilation system with the exhausting system method with force overlap with a discharge of 20 m³/s, and a spot cooler cooling system with a refrigeration power of 260 kW in mucking and hauling activities, and 180 kW in drilling activities, in order to meet the regulations of KepDirJen Minerba No.185.K/37.04/DJB/2019, which is in the range of 18-27°C.
format Final Project
author Andrew Purba, David
spellingShingle Andrew Purba, David
VENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE
author_facet Andrew Purba, David
author_sort Andrew Purba, David
title VENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE
title_short VENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE
title_full VENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE
title_fullStr VENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE
title_full_unstemmed VENTILATION NETWORK MODELING STUDY FOR PT XYZ UNDERGROUND MINE WORKING SURFACE TEMPERATURE CONDITION IN CUT AND FILL METHOD WITH VENTSIM 5 SOFTWARE
title_sort ventilation network modeling study for pt xyz underground mine working surface temperature condition in cut and fill method with ventsim 5 software
url https://digilib.itb.ac.id/gdl/view/75089
_version_ 1822994144179519488