DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL
PT KPI is the refining & petrochemical sub-holding company of PT Pertamina (Persero) that manage investments and runs Pertamina’s businesses in refining oil and gas to produce high-valueable products. Based on PT. KPI experiences, offently projects suffer delays and cost overruns which affe...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/75159 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:75159 |
---|---|
spelling |
id-itb.:751592023-07-25T13:53:08ZDESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL Mulyadi, Hendrikawan Manajemen umum Indonesia Theses design build competition, project execution strategy, refinery and petrochemical, AHP INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75159 PT KPI is the refining & petrochemical sub-holding company of PT Pertamina (Persero) that manage investments and runs Pertamina’s businesses in refining oil and gas to produce high-valueable products. Based on PT. KPI experiences, offently projects suffer delays and cost overruns which affect the quality of the project. This final project aimed to evaluate the project execution strategy DBC as strategy to improve project execution. This final project starts with the identification of the issue. To explore the business issue author will review and analyze the data to have broader informations which item contribute to cost overruns, change order and delays. From there the author will do an analysis using the Kepner-Trego (KT) Situation Analysis to identify Decision Analysis, Problem Analysis and Potential Problem Analysis. After the problem analysis has been identified, it will be evaluated using the 5Whys Cause-Effect Diagram method to find out the main/root cause analysis and propose solutions to overcome the problem. After that the series of data were analyzed using Analytical Hierarchy Process (AHP). Finally author will propose solution and implementation of alternative project execution strategy. The results showed that DBC strategy is the solution for PT. KPI to improve the execution of the project mainly in terms of duration and quality. The conclusion and recommendation of the study are that in order successfully executed DBC, PT. KPI should engage several strategic decisions which include organizational restructuring, resource allocation, and stakeholder management text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Manajemen umum |
spellingShingle |
Manajemen umum Mulyadi, Hendrikawan DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL |
description |
PT KPI is the refining & petrochemical sub-holding company of PT Pertamina (Persero)
that manage investments and runs Pertamina’s businesses in refining oil and gas to
produce high-valueable products. Based on PT. KPI experiences, offently projects suffer
delays and cost overruns which affect the quality of the project. This final project aimed
to evaluate the project execution strategy DBC as strategy to improve project execution.
This final project starts with the identification of the issue. To explore the business issue
author will review and analyze the data to have broader informations which item
contribute to cost overruns, change order and delays. From there the author will do an
analysis using the Kepner-Trego (KT) Situation Analysis to identify Decision Analysis,
Problem Analysis and Potential Problem Analysis. After the problem analysis has been
identified, it will be evaluated using the 5Whys Cause-Effect Diagram method to find out
the main/root cause analysis and propose solutions to overcome the problem. After that
the series of data were analyzed using Analytical Hierarchy Process (AHP). Finally author
will propose solution and implementation of alternative project execution strategy.
The results showed that DBC strategy is the solution for PT. KPI to improve the execution
of the project mainly in terms of duration and quality. The conclusion and
recommendation of the study are that in order successfully executed DBC, PT. KPI should
engage several strategic decisions which include organizational restructuring, resource
allocation, and stakeholder management
|
format |
Theses |
author |
Mulyadi, Hendrikawan |
author_facet |
Mulyadi, Hendrikawan |
author_sort |
Mulyadi, Hendrikawan |
title |
DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL |
title_short |
DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL |
title_full |
DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL |
title_fullStr |
DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL |
title_full_unstemmed |
DESIGN BUILD COMPETITION STRATEGY TO IMPROVE PROJECT EXECUTION QUALITY IN PT KILANG PERTAMINA INTERNATIONAL |
title_sort |
design build competition strategy to improve project execution quality in pt kilang pertamina international |
url |
https://digilib.itb.ac.id/gdl/view/75159 |
_version_ |
1822994178292842496 |