REDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025
At the Water Treatment Plant ITB Jatinangor, the conventional water treatment process includes intake, coagulation, flocculation, sedimentation, filtration, disinfection, and reservoir stages. However, with the implementation of the master plan for ITB's Jatinangor Campus, a review of the ex...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/75334 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:75334 |
---|---|
spelling |
id-itb.:753342023-07-26T17:22:02ZREDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025 Fathiaji Pangestu, Muhammad Teknik saniter dan perkotaan; teknik perlindungan lingkungan Indonesia Final Project Water Treatment Plant ITB Jatinangor, Masterplan Water Treatment Plant INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75334 At the Water Treatment Plant ITB Jatinangor, the conventional water treatment process includes intake, coagulation, flocculation, sedimentation, filtration, disinfection, and reservoir stages. However, with the implementation of the master plan for ITB's Jatinangor Campus, a review of the existing Water Treatment Plant's capacity is necessary. Various issues often arise in the water treatment plant, such as insufficient water demand, instrument malfunctions and errors, and a decline in the quality of the treated water. Human errors may also lead to accidents, such as distribution pipe leaks and discrepancies between production and distribution data. To address these problems, it is essential to assess whether the implemented systems and processes comply with the applicable regulations. Therefore, the evaluation and suggestions provided are expected to serve as inputs for improving the Water Treatment Plant ITB Jatinangor, both for personal development and the advancement of the surrounding environment text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
topic |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan |
spellingShingle |
Teknik saniter dan perkotaan; teknik perlindungan lingkungan Fathiaji Pangestu, Muhammad REDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025 |
description |
At the Water Treatment Plant ITB Jatinangor, the conventional water treatment process
includes intake, coagulation, flocculation, sedimentation, filtration, disinfection, and reservoir
stages. However, with the implementation of the master plan for ITB's Jatinangor Campus, a
review of the existing Water Treatment Plant's capacity is necessary. Various issues often
arise in the water treatment plant, such as insufficient water demand, instrument malfunctions
and errors, and a decline in the quality of the treated water. Human errors may also lead to
accidents, such as distribution pipe leaks and discrepancies between production and
distribution data. To address these problems, it is essential to assess whether the implemented
systems and processes comply with the applicable regulations. Therefore, the evaluation and
suggestions provided are expected to serve as inputs for improving the Water Treatment Plant
ITB Jatinangor, both for personal development and the advancement of the surrounding
environment |
format |
Final Project |
author |
Fathiaji Pangestu, Muhammad |
author_facet |
Fathiaji Pangestu, Muhammad |
author_sort |
Fathiaji Pangestu, Muhammad |
title |
REDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025 |
title_short |
REDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025 |
title_full |
REDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025 |
title_fullStr |
REDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025 |
title_full_unstemmed |
REDESIGN OF WATER TREATMENT PLANT TO SUPPORT THE MASTERPLAN ITB JATINANGOR FROM 2021-2025 |
title_sort |
redesign of water treatment plant to support the masterplan itb jatinangor from 2021-2025 |
url |
https://digilib.itb.ac.id/gdl/view/75334 |
_version_ |
1822280138490904576 |