REAL-TIME LOCATING SYSTEM UNTUK PELACAKAN WORK ORDER PADA SHOP FLOOR DETAIL PART MANUFACTURING PT DIRGANTARA INDONESIA
<p align="justify"> Based on data recapitulation of outstanding work orders from 2013 to 2021, as many as 10.678 work orders have not moved according to the production plan. Efforts made by management are audits by searching for work orders manually on the shop floor. Based on the au...
Saved in:
Main Author: | Steven |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75804 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PERANCANGAN PROTOTIPE REAL-TIME LOCATING SYSTEM UNTUK PELACAKAN WORK ORDER PADA SHOP FLOOR DETAIL PART MANUFACTURING PT DIRGANTARA INDONESIA
by: Steven -
PERANCANGAN SISTEM PEMANTAUAN POSISI WORK ORDER UNTUK DIVISI DETAIL PART MANUFACTURING PT DIRGANTARA INDONESIA
by: Kahfi, Muhammad -
PERANCANGAN SISTEM PEMANTAUAN EKSEKUSI PRODUKSI SECARA REAL-TIME PADA DIVISI DETAIL PART MANUFACTURING DI PT DIRGANTARA INDONESIA
by: Ai -
BUSINESS PROCESS IMPROVEMENT OF PRODUCTION AND PLANNING CONTROL OF DETAIL PART MANUFACTURING IN PT. DIRGANTARA INDONESIA
by: GITA ASARIA HUTAURUK (NIM : 13414006), YOSEPHINE -
CELLULAR MANUFACTURING DESIGN FOR A321 PROGRAM MACHINING AREA AT DETAIL PART MANUFACTURING DEPARTMENT PT DIRGANTARA INDONESIA
by: Makmur, Marco