DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.

<p align="justify"> The increasing number of electricity users in Jatiyoso District, Central Java, has occurred in recent years. In 2020, the number of electricity users in Jatiyoso District was recorded at 12,773 households, an increase of 79 households compared to 2019. This increa...

Full description

Saved in:
Bibliographic Details
Main Author: Catlyea Harahap, Adinda
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/75857
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:75857
spelling id-itb.:758572023-08-08T10:36:42ZDESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA. Catlyea Harahap, Adinda Indonesia Final Project Jlantah Reservoir, Jlantah Mini Hydro Power Plant, Intake Building, Power Plant Building, Turbine, Economic Feasibility Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/75857 <p align="justify"> The increasing number of electricity users in Jatiyoso District, Central Java, has occurred in recent years. In 2020, the number of electricity users in Jatiyoso District was recorded at 12,773 households, an increase of 79 households compared to 2019. This increase in electricity demand must be balanced with an increase in the source of electricity for the community. Therefore, by building the Jlantah Mini Hydro Power Plant (PLTM), it is expected to become one of the sources of electricity for the local community. The normal water level of the reservoir is planned at an elevation of +691.00 meters above sea level (masl) and the intake building elevation is at +661.00 masl. The total dead storage of the reservoir is 1.66 million ????3 and the total effective storage is 9.16 million ????3. The elevation of the power plant building is planned by analyzing the 100-year flood in the river around the power plant building plan. The power plant building is planned at an elevation of +624.00 masl. There are two turbines used in the power plant, with Turbine 1 having the HLA550-WJ-55 series and Turbine 2 having the HLA678-WJ-50 series. The average power generated in a normal year (2013) is 516.44 kW with a total energy of 4.47 GWh. The construction cost of the Jlantah PLTM is estimated to reach IDR 18,795,716,076.00 with normal annual revenue (2013) of IDR 4,060,935,522. With this revenue, the NPV value is IDR 4,461,454,224, IRR 12.96%, BCR 1.24, and PBP 12.78 years, making this project economically feasible. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description <p align="justify"> The increasing number of electricity users in Jatiyoso District, Central Java, has occurred in recent years. In 2020, the number of electricity users in Jatiyoso District was recorded at 12,773 households, an increase of 79 households compared to 2019. This increase in electricity demand must be balanced with an increase in the source of electricity for the community. Therefore, by building the Jlantah Mini Hydro Power Plant (PLTM), it is expected to become one of the sources of electricity for the local community. The normal water level of the reservoir is planned at an elevation of +691.00 meters above sea level (masl) and the intake building elevation is at +661.00 masl. The total dead storage of the reservoir is 1.66 million ????3 and the total effective storage is 9.16 million ????3. The elevation of the power plant building is planned by analyzing the 100-year flood in the river around the power plant building plan. The power plant building is planned at an elevation of +624.00 masl. There are two turbines used in the power plant, with Turbine 1 having the HLA550-WJ-55 series and Turbine 2 having the HLA678-WJ-50 series. The average power generated in a normal year (2013) is 516.44 kW with a total energy of 4.47 GWh. The construction cost of the Jlantah PLTM is estimated to reach IDR 18,795,716,076.00 with normal annual revenue (2013) of IDR 4,060,935,522. With this revenue, the NPV value is IDR 4,461,454,224, IRR 12.96%, BCR 1.24, and PBP 12.78 years, making this project economically feasible.
format Final Project
author Catlyea Harahap, Adinda
spellingShingle Catlyea Harahap, Adinda
DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.
author_facet Catlyea Harahap, Adinda
author_sort Catlyea Harahap, Adinda
title DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.
title_short DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.
title_full DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.
title_fullStr DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.
title_full_unstemmed DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.
title_sort design of jlantah mini hydro power plant (pltm) in jlantah reservoir, karanganyar regency, central java.
url https://digilib.itb.ac.id/gdl/view/75857
_version_ 1822007811707502592