DESIGN OF JLANTAH MINI HYDRO POWER PLANT (PLTM) IN JLANTAH RESERVOIR, KARANGANYAR REGENCY, CENTRAL JAVA.
<p align="justify"> The increasing number of electricity users in Jatiyoso District, Central Java, has occurred in recent years. In 2020, the number of electricity users in Jatiyoso District was recorded at 12,773 households, an increase of 79 households compared to 2019. This increa...
Saved in:
Main Author: | Catlyea Harahap, Adinda |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/75857 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS SEEPAGE AND SLOPE STABILITY FOR DAM: CASE STUDY JLANTAH DAM IN JATIYOSO, KARANGANYAR REGENCY, CENTRAL JAVA
by: Aulia Rahma, Aryandi -
DESIGN OF JLANTAH DAM COMPLEMENTARY BUILDINGS
by: Arya Nugroho, Faisal -
PLANNING SPILLWAY BUILDING OF JLANTAH DAM
by: Rogabe, David -
FLOOD CONTROL AT CILAKI 1B MINI HYDRO POWER PLANT (PLTM)
by: Marciano, Bobby -
ANALYSIS OF ENSO EFFECT ON POWER AND DEBIT FOR MINI HYDRO POWER PLANT (PLTM) (CASE STUDY KETAHUN 3 BASIN, BENGKULU)
by: 12812027