FEASIBILITY STUDY OF TIDAL POWER PLANT IN LOMBOK STRAIT, NUSA TENGGARA BARAT
At the COP26 Climate Conference in 2021, Indonesia committed to reducing greenhouse gas emissions and reaffirmed its goal to achieve Net Zero Emissions by 2060 or earlier. Mitigating climate change while ensuring energy resilience can be achieved through the development of Renewable Energy Source...
Saved in:
Main Author: | Azzahra, Safira |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76468 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF TIDAL STREAM GENERATOR FARM IN LOMBOK STRAIT, WEST NUSA TENGGARA
by: Tiffani -
PLANNING OF TIDAL CURRENT POWER PLANT IN ALAS STRAIT, WEST NUSA TENGGARA PROVINCE
by: Aulia Alfatihah, Ainunnisa -
FINANCIAL FEASIBILITY STUDY OF TIDAL TURBINE PROJECT AT LARANTUKA STRAIT, EAST NUSA TENGGARA
by: Harrison Hasiando M., Genta -
TIDAL TURBINE CONFIGURATION ANALYSIS AT LARANTUKA STRAIT, EAST NUSA TENGGARA, INDONESIA
by: Seravina, Audrey -
TIDAL CURRENT ENERGY RESOURCES ASSESSMENT IN PANTAR STRAIT, NUSA TENGGARA TIMUR
by: Adies Oktavianti, Theresia