CHANGE ORDER RISK ANALYSIS OF BUILDING REHABILITATION PROJECTS (CASE STUDY: BUILDING X REHABILITATION PROJECT)
Saved in:
Main Author: | Yunita Permata Rahibi, Nira |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76533 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REHABILITATION OF OLD BUILDINGS
by: CHAN SWEE YEE
Published: (2019) -
REHABILITATION, MAINTENANCE AND MANAGEMENT OF HISTORIC BUILDINGS IN SINGAPORE
by: TONG KOK WING
Published: (2019) -
REHABILITATION OF HISTORICAL BUILDINGS FOR CULTURAL USE - A STUDY OF THE SUBSTATION
by: YAP NENG TONG
Published: (2020) -
Simulation study of a major bridge rehabilitation project in Sri Lanka
by: Cheah, Francis Kok Seng., et al.
Published: (2009) -
CONTRACT CHANGE ORDERS HANDLING OF DESIGN-BID-BUILD PROJECTS WITH FINANCING FOREIGN LOAN.
by: Islahiyah, Madaliatul