ANALYSIS OF CAUSES, IMPACTS, AND HOW TO MITIGATE CONTRACT CHANGE ORDER IN THE THAMRIN NINE PHASE II BUILDING PROJECT

In the construction process of an infrastructure project, almost all projects always experience changes from the initial contract document or what is commonly referred to as a contract change order. Contract change order is one of the problems in the construction industry sector that never ends and...

Full description

Saved in:
Bibliographic Details
Main Author: Alfatah Abiyu Otslan, Giffary
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/66037
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia