ANALYSIS OF CAUSES, IMPACTS, AND HOW TO MITIGATE CONTRACT CHANGE ORDER IN THE THAMRIN NINE PHASE II BUILDING PROJECT
In the construction process of an infrastructure project, almost all projects always experience changes from the initial contract document or what is commonly referred to as a contract change order. Contract change order is one of the problems in the construction industry sector that never ends and...
Saved in:
Main Author: | Alfatah Abiyu Otslan, Giffary |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/66037 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
COMPARATIVE STUDY OF CONSTRUCTION CONTRACTOR LICENSING SYSTEM IN INDONESIA WITH SINGAPOREÂ ANDÂ MALAYSIA
by: Alfatah Abiyu Otslan, Giffary -
CONTRACT CHANGE ORDERS HANDLING OF DESIGN-BID-BUILD PROJECTS WITH FINANCING FOREIGN LOAN.
by: Islahiyah, Madaliatul -
UNDERGROUND URBANISM: DESIGNING UNDERGROUND PEDESTRIAN NETWORK IN THAMRIN AREA, JAKARTA
by: Azizie, Haniek -
EVALUATION OF THE EFFECTIVENESS OF INJECTION WELLS FOR THE THAMRIN-MONAS MRT JAKARTA UNDERGROUND STATION EXCAVATION
by: Rustica Absari, Hirundini -
CONTRACTOR PROJECT MANAGEMENT IN DESIGN AND BUILD CONTRACT
by: STEVEN SOO MIN SING
Published: (2018)