OFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ

PT XYZ is one of tin mining companies located in Bangka Belitung Province. Tin deposits that will be mined by PT XYZ are secondary tin deposits located under the sea so that the dredger will be used to mine the ore. Production scheduling of PT XYZ will be simulated using Micromine 2023 and Datam...

Full description

Saved in:
Bibliographic Details
Main Author: Nur Hidayat, Yasyfa
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/76723
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:76723
spelling id-itb.:767232023-08-18T09:23:47ZOFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ Nur Hidayat, Yasyfa Indonesia Final Project mining production scheduling, secondary tin ore, cutter suction dredger, material balance, waste dump scheduling INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/76723 PT XYZ is one of tin mining companies located in Bangka Belitung Province. Tin deposits that will be mined by PT XYZ are secondary tin deposits located under the sea so that the dredger will be used to mine the ore. Production scheduling of PT XYZ will be simulated using Micromine 2023 and Datamine Studio OP. From the results of the mining production scheduling planning, a total reserve of 32,833,697 BCM of ore with an average grade of 0,76 kg Sn/m3 was obtained for the entire mine life, which spans five years. The highest tin ore production occurred in the fourth year, reaching 9,570,634 BCM, while the maximum tin concentrate was achieved in the third year, reaching 2,575 tons. The production equipment is determinated by considering working circumstances, annual mining volume, annual effective working hour, and dredger productivity. Cutter suction dredger (CSD) are the type of equipment that will be used to mine the ore with maximum number of CSD is 8 and it takes place between the second and fourth year. The mass balance calculation is used to estimate the annual volume of waste that will be accumulated over the life of mine with a total waste volume is 32.504.101 BCM or 38.240.118 LCM. The maximum amount of waste that must be accumulated is 8.815.109 BCM or 10.370.717 LCM and it occurs in the third year. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT XYZ is one of tin mining companies located in Bangka Belitung Province. Tin deposits that will be mined by PT XYZ are secondary tin deposits located under the sea so that the dredger will be used to mine the ore. Production scheduling of PT XYZ will be simulated using Micromine 2023 and Datamine Studio OP. From the results of the mining production scheduling planning, a total reserve of 32,833,697 BCM of ore with an average grade of 0,76 kg Sn/m3 was obtained for the entire mine life, which spans five years. The highest tin ore production occurred in the fourth year, reaching 9,570,634 BCM, while the maximum tin concentrate was achieved in the third year, reaching 2,575 tons. The production equipment is determinated by considering working circumstances, annual mining volume, annual effective working hour, and dredger productivity. Cutter suction dredger (CSD) are the type of equipment that will be used to mine the ore with maximum number of CSD is 8 and it takes place between the second and fourth year. The mass balance calculation is used to estimate the annual volume of waste that will be accumulated over the life of mine with a total waste volume is 32.504.101 BCM or 38.240.118 LCM. The maximum amount of waste that must be accumulated is 8.815.109 BCM or 10.370.717 LCM and it occurs in the third year.
format Final Project
author Nur Hidayat, Yasyfa
spellingShingle Nur Hidayat, Yasyfa
OFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ
author_facet Nur Hidayat, Yasyfa
author_sort Nur Hidayat, Yasyfa
title OFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ
title_short OFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ
title_full OFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ
title_fullStr OFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ
title_full_unstemmed OFFSHORE TIN MINING PRODUCTION AND WASTE DUMP SCHEDULING OF PT XYZ
title_sort offshore tin mining production and waste dump scheduling of pt xyz
url https://digilib.itb.ac.id/gdl/view/76723
_version_ 1822008062516396032