PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE

The waste management system in the earthquake-affected area of Cianjur, specifically Cugenang Subdistrict in West Java, is planned to be handled separately for easily decomposable waste (putrescible), economically valuable inorganic waste, and residual waste. Economically valuable inorganic wa...

Full description

Saved in:
Bibliographic Details
Main Author: Ivanta Purba, Benediktus
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/76740
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Description
Summary:The waste management system in the earthquake-affected area of Cianjur, specifically Cugenang Subdistrict in West Java, is planned to be handled separately for easily decomposable waste (putrescible), economically valuable inorganic waste, and residual waste. Economically valuable inorganic waste will be sold to a Waste Bank, residual waste will be processed at the Pasir Sembung Cianjur landfill, while putrescible waste from the study area will be entirely processed at the designed putrescible waste management facility. The designed facility is capable of processing putrescible waste using Black Soldier Fly (BSF) larvae. Residual waste from the BSF larvae processing will be further processed using windrow composting along with leaf/plant waste. The final products of the designed putrescible waste management facility are wet BSF larvae (fresh maggots) and compost. The produced fresh maggots will be sold to local poultry and fish farmers. An economic feasibility analysis of the construction of the putrescible waste management facility in the study area was conducted using the Net Present Value (NPV) method. The analysis considers the Bank Indonesia's reference interest rate of 5.75% in 2023. The analysis reveals that the construction of the facility has a positive NPV of Rp32,316,500 for a design period of 5 years. The total cost required for the construction of the facility is Rp4,051,939,000, and the operational cost for the designed facility is Rp965,907,456 per year. The cost required for waste processing is Rp1,011,390 per ton of waste, and the construction cost is Rp6,111,522 per square meter. Based on these calculations, the project can achieve the Break-Even Point (BEP) after 0.8 years of operation.