PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE
The waste management system in the earthquake-affected area of Cianjur, specifically Cugenang Subdistrict in West Java, is planned to be handled separately for easily decomposable waste (putrescible), economically valuable inorganic waste, and residual waste. Economically valuable inorganic wa...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76740 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:76740 |
---|---|
spelling |
id-itb.:767402023-08-18T09:47:21ZPLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE Ivanta Purba, Benediktus Indonesia Final Project : BSF processing, Cugenang Subdistrict, post-disaster, putrescible waste, waste management INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/76740 The waste management system in the earthquake-affected area of Cianjur, specifically Cugenang Subdistrict in West Java, is planned to be handled separately for easily decomposable waste (putrescible), economically valuable inorganic waste, and residual waste. Economically valuable inorganic waste will be sold to a Waste Bank, residual waste will be processed at the Pasir Sembung Cianjur landfill, while putrescible waste from the study area will be entirely processed at the designed putrescible waste management facility. The designed facility is capable of processing putrescible waste using Black Soldier Fly (BSF) larvae. Residual waste from the BSF larvae processing will be further processed using windrow composting along with leaf/plant waste. The final products of the designed putrescible waste management facility are wet BSF larvae (fresh maggots) and compost. The produced fresh maggots will be sold to local poultry and fish farmers. An economic feasibility analysis of the construction of the putrescible waste management facility in the study area was conducted using the Net Present Value (NPV) method. The analysis considers the Bank Indonesia's reference interest rate of 5.75% in 2023. The analysis reveals that the construction of the facility has a positive NPV of Rp32,316,500 for a design period of 5 years. The total cost required for the construction of the facility is Rp4,051,939,000, and the operational cost for the designed facility is Rp965,907,456 per year. The cost required for waste processing is Rp1,011,390 per ton of waste, and the construction cost is Rp6,111,522 per square meter. Based on these calculations, the project can achieve the Break-Even Point (BEP) after 0.8 years of operation. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
The waste management system in the earthquake-affected area of Cianjur,
specifically Cugenang Subdistrict in West Java, is planned to be handled separately for easily
decomposable waste (putrescible), economically valuable inorganic waste, and residual waste.
Economically valuable inorganic waste will be sold to a Waste Bank, residual waste will be
processed at the Pasir Sembung Cianjur landfill, while putrescible waste from the study area
will be entirely processed at the designed putrescible waste management facility. The designed
facility is capable of processing putrescible waste using Black Soldier Fly (BSF) larvae.
Residual waste from the BSF larvae processing will be further processed using windrow
composting along with leaf/plant waste. The final products of the designed putrescible waste
management facility are wet BSF larvae (fresh maggots) and compost. The produced fresh
maggots will be sold to local poultry and fish farmers. An economic feasibility analysis of the
construction of the putrescible waste management facility in the study area was conducted
using the Net Present Value (NPV) method. The analysis considers the Bank Indonesia's
reference interest rate of 5.75% in 2023. The analysis reveals that the construction of the
facility has a positive NPV of Rp32,316,500 for a design period of 5 years. The total cost
required for the construction of the facility is Rp4,051,939,000, and the operational cost for
the designed facility is Rp965,907,456 per year. The cost required for waste processing is
Rp1,011,390 per ton of waste, and the construction cost is Rp6,111,522 per square meter.
Based on these calculations, the project can achieve the Break-Even Point (BEP) after 0.8
years of operation.
|
format |
Final Project |
author |
Ivanta Purba, Benediktus |
spellingShingle |
Ivanta Purba, Benediktus PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE |
author_facet |
Ivanta Purba, Benediktus |
author_sort |
Ivanta Purba, Benediktus |
title |
PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE |
title_short |
PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE |
title_full |
PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE |
title_fullStr |
PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE |
title_full_unstemmed |
PLANNING FOR POST-EARTHQUAKE PUTRESCIBLE WASTE MANAGEMENT IN AFFECTED AREAS IN CIANJUR REGENCY, WEST JAVA PROVINCE |
title_sort |
planning for post-earthquake putrescible waste management in affected areas in cianjur regency, west java province |
url |
https://digilib.itb.ac.id/gdl/view/76740 |
_version_ |
1822995038254137344 |