ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ

PT XYZ is a copper and gold mining company that has been operating the BJ Mine since 2000. In 2020, advancements in mining at PT XYZ's BJ Mine led to changes in land excavation, affecting water management in the BS Zone. The BS Zone is part of the BJ Mine area, situated North-Northwest of th...

Full description

Saved in:
Bibliographic Details
Main Author: Magfirah, Irma
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/76768
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:76768
spelling id-itb.:767682023-08-18T11:30:15ZANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ Magfirah, Irma Indonesia Final Project Runoff Area Composition, Volume Load, Surface Runoff INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/76768 PT XYZ is a copper and gold mining company that has been operating the BJ Mine since 2000. In 2020, advancements in mining at PT XYZ's BJ Mine led to changes in land excavation, affecting water management in the BS Zone. The BS Zone is part of the BJ Mine area, situated North-Northwest of the BJ Mine Pit. Water volume flows from here to the ST pond via gravity. The land excavation includes components like undisturbed (jungle area), disturbed (unreclaimed area), and reclaimed areas, each with different runoff behaviors causing varying water quantities. A potential concern is extreme rainfall causing forest diversion channel burden to overflow into the ST pond, increasing the volume load. Thus, analyzing land excavation changes and forest diversion effects on volume load in the BS Zone is crucial. Research found an average 2.01% volume load change due to runoff area variations. These changes in the BS Zone during 2023-2028 didn't significantly impact volume load, yet showed an average annual 0.55% increase. Forest diversion significantly influenced BS Zone volume load, with an average 25.5% increase from the total volume load. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT XYZ is a copper and gold mining company that has been operating the BJ Mine since 2000. In 2020, advancements in mining at PT XYZ's BJ Mine led to changes in land excavation, affecting water management in the BS Zone. The BS Zone is part of the BJ Mine area, situated North-Northwest of the BJ Mine Pit. Water volume flows from here to the ST pond via gravity. The land excavation includes components like undisturbed (jungle area), disturbed (unreclaimed area), and reclaimed areas, each with different runoff behaviors causing varying water quantities. A potential concern is extreme rainfall causing forest diversion channel burden to overflow into the ST pond, increasing the volume load. Thus, analyzing land excavation changes and forest diversion effects on volume load in the BS Zone is crucial. Research found an average 2.01% volume load change due to runoff area variations. These changes in the BS Zone during 2023-2028 didn't significantly impact volume load, yet showed an average annual 0.55% increase. Forest diversion significantly influenced BS Zone volume load, with an average 25.5% increase from the total volume load.
format Final Project
author Magfirah, Irma
spellingShingle Magfirah, Irma
ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ
author_facet Magfirah, Irma
author_sort Magfirah, Irma
title ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ
title_short ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ
title_full ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ
title_fullStr ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ
title_full_unstemmed ANALYSIS OF VOLUME LOAD CHANGES IN THE BS ZONE OF BJ MINE PT XYZ
title_sort analysis of volume load changes in the bs zone of bj mine pt xyz
url https://digilib.itb.ac.id/gdl/view/76768
_version_ 1822280554831151104