EVALUATION OF DRAINAGE SYSTEM STRATEGIES FOR PIT ZONE AND BUFFER POND DUE TO PHASE CHANGES IN MINING ACTIVITIES AT ABC MINE SITE PT XYZ
The open-pit mine, ABC, owned by PT XYZ, is planning to make changes to its mining phase, where the latest phase involves pit floor lowering. One crucial aspect to be considered is water management to ensure that mining operations on the pit floor can be conducted for at least 9 months in a year....
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76836 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |