EVALUATION OF DRAINAGE SYSTEM STRATEGIES FOR PIT ZONE AND BUFFER POND DUE TO PHASE CHANGES IN MINING ACTIVITIES AT ABC MINE SITE PT XYZ

The open-pit mine, ABC, owned by PT XYZ, is planning to make changes to its mining phase, where the latest phase involves pit floor lowering. One crucial aspect to be considered is water management to ensure that mining operations on the pit floor can be conducted for at least 9 months in a year....

Full description

Saved in:
Bibliographic Details
Main Author: Yasyin A R S, Mohammad
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/76836
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
Be the first to leave a comment!
You must be logged in first