EVALUATION OF TARGET PRODUCTION ATTAINMENT FOR HEAVY EQUIPMENT UTILIZING QUEUEING THEORY IN OVERBURDEN REMOVAL AT PIT B PT XYZ
PT XYZ is one of the coal mining companies in Indonesia which is a supplier of coal for PLTU needs. The applied mining system is an open pit mining system using a combination of a backhoe as a digging tool and a dump truck as a means of conveyance. One of the important activities in open pit mini...
Saved in:
Main Author: | Tri Hartati, Linda |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/76834 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPTIMIZATION MODEL FOR SELECTING LOADING AND HAULING EQUIPMENT IN OVERBURDEN REMOVAL ACTIVITIES AT PIT PS PT. XYZ
by: Ramdhani, Bintang -
STUDI KARAKTERISASI GEOKIMIA SAMPEL OVERBURDEN TAMBANG BATUBARA PT. XYZ PADA PIT K
by: Muhammad D, Farhan -
OPTIMIZATION OF OVERBURDEN DISTRIBUTION USING LINEAR PROGRAMMING AT GRASBERG OPEN PIT
by: MAHAYASA (NIM : 29107134); Pembimbing: Ir. Rudy Bekti, MM, MADE -
STUDI KARAKTERISASI GEOKIMIA SAMPEL OVERBURDEN DI PIT GM PT. B
by: Farhan Muzzammil, M -
SYSTEM DYNAMIC MODELING FOR ANALYZING FUEL RATIO OF OVERBURDEN TRUCK IN PIT INUL LIGNIT PT. KALTIM PRIMA COAL
by: Rusmawati, Yulia