TECHNICAL ANALYSIS OF THE MINE DEWATERING SYSTEM DESIGN BASED ON EXTREME RAINFALL FOR ACCELERATING IN-PIT DUMP AT PIT ABC, PT XYZ

The coal mining company, PT XYZ, requires acceleration of the in-pit dump at pit ABC, located in the southern zone of the ABC sump area at an elevation of 24 meters above sea level. To support this need, an analysis of a mine dewatering system plan appropriate to the field conditions is necessary. O...

Full description

Saved in:
Bibliographic Details
Main Author: Dewa Yasthy, Rifky
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/85528
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia