TECHNICAL ANALYSIS OF THE MINE DEWATERING SYSTEM DESIGN BASED ON EXTREME RAINFALL FOR ACCELERATING IN-PIT DUMP AT PIT ABC, PT XYZ
The coal mining company, PT XYZ, requires acceleration of the in-pit dump at pit ABC, located in the southern zone of the ABC sump area at an elevation of 24 meters above sea level. To support this need, an analysis of a mine dewatering system plan appropriate to the field conditions is necessary. O...
Saved in:
Main Author: | Dewa Yasthy, Rifky |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/85528 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PREDICTION OF PIT LAKE WATER QUALITY IN COAL MINING (CASE STUDY IN PIT ABC PT XYZ)
by: RAIN PRATAMA (NIM : 22115021), GINDANG -
CASE STUDY OF INPIT DUMP INSTABILITY AT PIT M PT XYZ
by: LUTFIAH (NIM : 12114093), IFFAH -
STABILITY ANALYSIS ON THE HIGHWALL AND IN-PIT DUMP SLOPE OF PT XYZ'S LIFE OF MINE (LOM) DESIGN IN BENGKULU
by: Nesta, Alessandro -
SIMULATION MODEL FOT POST-MINING PIT LAKE INFILLING AT PT XYZ'S MINING PIT
by: Syahrani, Mega -
HYDROMINE SOLUTION: OPTIMIZATION TOOLS FOR MINE DRAINAGE AND DEWATERING IN OPEN-PIT MINING
by: Rahmadani, Fahrul