BINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN

The Bintaro Community and Creative Center building is designed as an infrastructure for collaborative creative economic activities aimed at addressing the gated community phenomenon in the Bintaro area, South Tangerang. The final project aims to design the foundation capable of supporting the str...

Full description

Saved in:
Bibliographic Details
Main Author: Rahadian Widyananda, Ilham
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/77141
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:77141
spelling id-itb.:771412023-08-22T15:16:29ZBINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN Rahadian Widyananda, Ilham Indonesia Final Project driven pile foundation, bored pile foundation, soil nailing. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/77141 The Bintaro Community and Creative Center building is designed as an infrastructure for collaborative creative economic activities aimed at addressing the gated community phenomenon in the Bintaro area, South Tangerang. The final project aims to design the foundation capable of supporting the structural load and designing retaining walls for the basement excavation process. Two types of foundations are used: driven pile foundations, 22 meters deep with a diameter of 0.6 meters, and bored pile foundations, also 22 meters deep but with a diameter of 0.8 meters. The foundation design involves analyzing the axial load capacity of single and grouped piles, lateral load capacity analysis of piles using the LPILE software, lateral load capacity analysis of grouped piles using the GROUP software, settlement and differential settlement analysis of the foundations, reinforcement design of the bored pile foundations and pile caps, as well as the design of tie beams. Two pile cap configurations are designed for the building at elevation 0 meters, and three pile cap configurations are designed for the basement at elevation -8 meters. The basement of the Bintaro Community and Creative Center building consists of 2 floors, each with a height of 4 meters, requiring an excavation depth of 8 meters. A retaining wall with soil nailing reinforcement is chosen, considering the soil conditions and construction methods. Stability analysis for the excavation stages and stability of the soil nailing retaining wall is performed using the PLAXIS 2D software. Based on the analysis results, soil nailing with a length of 8 meters and a borehole diameter of 0.2 meters is required, reinforced with 29 millimeter nail bar reinforcement. The face cover is designed using a 0.1-meter thick shotcrete wall reinforced with wire mesh. Dewatering before excavation is carried out using the wellpoint method through 45 points. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The Bintaro Community and Creative Center building is designed as an infrastructure for collaborative creative economic activities aimed at addressing the gated community phenomenon in the Bintaro area, South Tangerang. The final project aims to design the foundation capable of supporting the structural load and designing retaining walls for the basement excavation process. Two types of foundations are used: driven pile foundations, 22 meters deep with a diameter of 0.6 meters, and bored pile foundations, also 22 meters deep but with a diameter of 0.8 meters. The foundation design involves analyzing the axial load capacity of single and grouped piles, lateral load capacity analysis of piles using the LPILE software, lateral load capacity analysis of grouped piles using the GROUP software, settlement and differential settlement analysis of the foundations, reinforcement design of the bored pile foundations and pile caps, as well as the design of tie beams. Two pile cap configurations are designed for the building at elevation 0 meters, and three pile cap configurations are designed for the basement at elevation -8 meters. The basement of the Bintaro Community and Creative Center building consists of 2 floors, each with a height of 4 meters, requiring an excavation depth of 8 meters. A retaining wall with soil nailing reinforcement is chosen, considering the soil conditions and construction methods. Stability analysis for the excavation stages and stability of the soil nailing retaining wall is performed using the PLAXIS 2D software. Based on the analysis results, soil nailing with a length of 8 meters and a borehole diameter of 0.2 meters is required, reinforced with 29 millimeter nail bar reinforcement. The face cover is designed using a 0.1-meter thick shotcrete wall reinforced with wire mesh. Dewatering before excavation is carried out using the wellpoint method through 45 points.
format Final Project
author Rahadian Widyananda, Ilham
spellingShingle Rahadian Widyananda, Ilham
BINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN
author_facet Rahadian Widyananda, Ilham
author_sort Rahadian Widyananda, Ilham
title BINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN
title_short BINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN
title_full BINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN
title_fullStr BINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN
title_full_unstemmed BINTARO COMMUNITY AND CREATIVE CENTER BUILDING PILE FOUNDATION AND SOIL NAILING WALL DESIGN
title_sort bintaro community and creative center building pile foundation and soil nailing wall design
url https://digilib.itb.ac.id/gdl/view/77141
_version_ 1822995215091236864