INVESTMENT DECISION FOR A GEOTHERMAL POWER PROJECT USING REAL OPTIONS VALUATION IN INDONESIA
Geothermal development in Indonesia always does not reach the targets set in the roadmap which is more because geothermal exploitation often does not achieve project economics hence it is not attractive to investors. Three factors cause this problem, namely energy prices, tender mechanisms, and high...
Saved in:
Main Author: | Putri Larasati, Nabila |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/77192 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
INVESTMENT PROJECT ANALYSIS OF PTBC BLOCK 9 COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Prio Prakoso, Anjas -
REAL OPTIONS VALUATION OF COAL MINING PROJECT USING BINOMIAL LATTICE MODEL
by: MARULI IKHSANI, SETIADY -
ECONOMIC ANALYSIS OF COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Sukmara Krisna, Okto -
INVESTMENT PROJECT ANALYSIS PIT C2 BLOCK 8 USING DISCOUNTED CASH FLOW (DCF) & REAL OPTIONS VALUATION (ROV) (CASE STUDY OF PT.BERAU COAL)
by: Bahri S, Syamsul -
INVESTMENT ANALYSIS OF 50 MW GEOTHERMAL POWER PLANT FOR INDEPENDENT POWER PRODUCER IN EASTERN INDONESIA
by: Sihwan Abdullah, Muhammad