CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY
Food Hub Barelang in Batam City is an integrated area that combines agricultural activities, fisheries, culinary tourism, and educational tourism related to food. The Food Hub area consists of 4 separate buildings, which are the Food Hall Main Building, Wet Market, Loading Dock, and Greenhouse. F...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77246 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Food Hub Barelang in Batam City is an integrated area that combines
agricultural activities, fisheries, culinary tourism, and educational tourism related
to food. The Food Hub area consists of 4 separate buildings, which are the Food
Hall Main Building, Wet Market, Loading Dock, and Greenhouse. For this final
project, the focus is on the planning of the Main Building. The Main Building is
designed with reinforced concrete as the main material. It comprises 4 floors and 1
semi-basement floor.
This final project will include the planning of Construction Engineering
Management, which involves site planning, work breakdown structure,
construction methods, construction cost estimation, and project scheduling. The
Food Hub Barelang project in Batam City consists of several phases, including site
preparation, earthworks, substructure works, upper concrete structure works, roof
structure works, and road pavement works for access. Each of these phases has
specific sub-works to facilitate the construction process. The project is scheduled
to run for 202 calendar days and 170 working days, with a direct project cost of Rp
51,656,112,375. The indirect cost is Rp 8,510,744,017. The total Planned Budget
Execution (RAP) for the project is Rp 60,166,856,393, while the Estimated Cost
Budget (RAB) for the project is Rp 71,598,560,000.
|
---|